← Change station

London St Pancras (Intl)

From Monday 15 June until mid-September, step free access will be unavailable for the Thameslink platforms, A and B, as the lifts will be closed for major refurbishment works.

From Monday 15 June until mid-September, step free access will be unavailable for the Thameslink platforms, A and B, as the lifts will be closed for major refurbishment works at London St Pncras station.

Earlier trains
00:11
Bedford
9V96 • Thameslink • 8 coaches
B
00:12
Ashford International
1J78 • Southeastern • 6 coaches
12
00:18
Bedford
9O98 • Thameslink • 8 coaches
B
00:24
00:25
Three Bridges
9W19 • Thameslink • 8 coaches
A
00:31
Bedford
9W16 • Thameslink • 12 coaches
B
00:46
Peterborough
9W90 • Thameslink • 8 coaches
B
00:54
Brighton
9W21 • Thameslink • 12 coaches
A
00:58
01:02
Bedford
9W18 • Thameslink • 8 coaches
B
01:32
Three Bridges
9W01 • Thameslink • 12 coaches
A
01:44
Bedford
9W00 • Thameslink • 12 coaches
B
Later trains
Powered by National Rail Enquiries