← Change station

London St Pancras (Intl)

From Monday 15 June until mid-September, step free access will be unavailable for the Thameslink platforms, A and B, as the lifts will be closed for major refurbishment works.

From Monday 15 June until mid-September, step free access will be unavailable for the Thameslink platforms, A and B, as the lifts will be closed for major refurbishment works at London St Pncras station.

03:32
03:33
Three Bridges
9W09 • Thameslink • 12 coaches
A
03:44
Bedford
9W08 • Thameslink • 12 coaches
B
04:32
04:33
Brighton
9W13 • Thameslink • 12 coaches
A
04:44
Bedford
9W12 • Thameslink • 8 coaches
B
Later trains
Powered by National Rail Enquiries