← Change station

Wimbledon

All toilets at Wimbledon will be closed for refurbishment from Monday 12 January 2026 until early spring.
The lifts serving platform 9 are out of order at Wimbledon station.
Trains running between London Blackfriars and London Bridge may be delayed up to 20 minutes or revised.Latest information can be found in Status and Disruptions.
Earlier trains
23:37
23:40
Bedford
9O98 • Thameslink • 8 coaches
23:39
London Waterloo
2D78 • South Western Railway
23:43
Twickenham
2K73 • South Western Railway
23:44
London Waterloo
2J78 • South Western Railway
23:47
London Waterloo
2H78 • South Western Railway
23:52
Hampton Court
2J75 • South Western Railway
23:55
Sutton (London)
9V83 • Thameslink • 8 coaches
23:58
Guildford via Epsom
2D75 • South Western Railway
00:06
Guildford via Cobham
2G77 • South Western Railway
00:08
London Waterloo
2O73 • South Western Railway
00:13
Shepperton
2H77 • South Western Railway
00:14
London Waterloo
2F82 • South Western Railway
00:23
London Waterloo
2P82 • South Western Railway
00:25
Woking
2F77 • South Western Railway
00:28
Strawberry Hill
2K77 • South Western Railway
Later trains
by Gaelan • Feedback • Source
Powered by Huxley
Powered by National Rail Enquiries