← Change station
Sawbridgeworth
Major engineering work is taking place at London Liverpool Street. Latest information can be found in
Status and Disruptions.
Major engineering work will be taking place in the Cambridge area. Latest information can be found in
Status and Disruptions.
Earlier trains
08:02
Stratford (London)
2S05 • Greater Anglia • 5 coaches
1
08:32
Stratford (London)
2S07 • Greater Anglia • 5 coaches
1
08:38
Bishops Stortford
2S02 • Greater Anglia • 5 coaches
2
09:02
Stratford (London)
2S09 • Greater Anglia • 5 coaches
1
09:08
Bishops Stortford
2S04 • Greater Anglia • 5 coaches
2
Later trains