← Change station

Roydon

Major engineering work is taking place at London Liverpool Street. Latest information can be found in Status and Disruptions.
Major engineering work will be taking place in the Cambridge area. Latest information can be found in Status and Disruptions.
Earlier trains
23:28
Bishops Stortford
2S72 • Greater Anglia • 10 coaches
2
23:42
Stratford (London)
2S75 • Greater Anglia • 10 coaches
1
23:58
Stansted Airport
2B74 • Greater Anglia • 10 coaches
2
00:12
Stratford (London)
2S77 • Greater Anglia • 10 coaches
1
00:27
Stansted Airport
2B76 • Greater Anglia
2
Later trains
by Gaelan • Feedback • Source
Powered by Huxley
Powered by National Rail Enquiries