← Change station

Hackney Downs

The lifts are out of order between the interchange and the exit/entry at Hackney Downs station.
Major engineering work is taking place at London Liverpool Street. Latest information can be found in Status and Disruptions.
Major engineering work will be taking place in the Cambridge area. Latest information can be found in Status and Disruptions.
Earlier trains
05:30
London Fields
2T99 • London Overground
3
05:50
London Fields
2T01 • London Overground
3
05:54
Cheshunt via Seven Sisters
2D00 • London Overground
4
06:05
London Fields
2D01 • London Overground
3
06:09
Enfield Town
2U02 • London Overground
4
06:20
Chingford
2T02 • London Overground
06:20
London Fields
2T03 • London Overground
3
06:34
Cheshunt via Seven Sisters
2D04 • London Overground
06:35
London Fields
2U03 • London Overground
Later trains
by Gaelan • Feedback • Source
Powered by Huxley
Powered by National Rail Enquiries