← Change station

East Croydon

The lifts are out of order between platforms 3 / 4 and the footbridge / Caithness Walk exit at East Croydon station.
The lifts are out of order between the footbridge and platforms 5/6 at East Croydon station.
Major engineering work is taking place between London St Pancras International and Harpenden until Sunday 29 December. Latest information can be found in Status and Disruptions
Earlier trains
04:07
Three Bridges
9T79 • Thameslink
6
04:10
cancelled
London Bridge
9T78 • Thameslink
5
04:40
London Bridge
9T80 • Thameslink
05:07
cancelled
Brighton
9T81 • Thameslink
05:10
London Bridge
9T82 • Thameslink
05:16
London Bridge
9R00 • Thameslink
Later trains
Powered by National Rail Enquiries