← Change station

East Croydon

The lifts are out of order between platforms 3 / 4 and the footbridge / Caithness Walk exit at East Croydon station.
The lifts are out of order between the footbridge and platforms 5/6 at East Croydon station.
Major engineering work is taking place between London St Pancras International and Harpenden until Sunday 29 December. Latest information can be found in Status and Disruptions
Earlier trains
01:10
London Bridge
9T00 • Thameslink • 12 coaches
4
01:28
cancelled
Brighton
9T94 • Thameslink
01:33
Brighton
1A80 • Southern • 8 coaches
02:07
Three Bridges
9T75 • Thameslink
02:10
London Bridge
9T74 • Thameslink
03:07
Three Bridges
9T77 • Thameslink
Later trains
Powered by National Rail Enquiries