← Change station

East Croydon

The lifts are out of order between platforms 3 / 4 and the footbridge / Caithness Walk exit at East Croydon station.
The lifts are out of order between the footbridge and platforms 5/6 at East Croydon station.
Major engineering work is taking place between London St Pancras International and Harpenden until Sunday 29 December. Latest information can be found in Status and Disruptions
Earlier trains
00:32
Gatwick Airport
1T00 • Southern • 8 coaches
6
00:35
00:36
Caterham
1P76 • Southern • 10 coaches
6
00:41
Brighton
9T91 • Thameslink • 12 coaches
5
01:10
London Bridge
9T00 • Thameslink • 12 coaches
4
01:28
cancelled
Brighton
9T94 • Thameslink
6
01:33
Brighton
1A80 • Southern • 8 coaches
6
02:07
Three Bridges
9T75 • Thameslink
6
02:10
London Bridge
9T74 • Thameslink
4
Later trains
Powered by National Rail Enquiries