← Change station

London Blackfriars

The lifts are out of order between platforms 2 and 3 and the mezzanine on the south bank entrance at London Blackfriars station. Step free access is available to the Southbank via the lift on platform 4 and lift from platform 1. The north bank entrance is fully accessible.
Trains at Stevenage may be cancelled, severely delayed by up to 75 minutes or revised. More details can be found in Status and Disruptions.
Earlier trains
00:01
Three Bridges
9N17 • Thameslink
1
00:02
Bedford
9V96 • Thameslink • 8 coaches
2
00:09
Bedford
9O98 • Thameslink • 8 coaches
2
00:22
Bedford
9N16 • Thameslink • 12 coaches
2
00:32
Three Bridges
9N19 • Thameslink • 8 coaches
1
00:36
cancelled
Peterborough
9J90 • Thameslink • 8 coaches
00:50
Bedford
9N18 • Thameslink • 8 coaches
2
01:02
Three Bridges
9N21 • Thameslink
1
01:36
Bedford
9N00 • Thameslink
2
01:40
Three Bridges
9N01 • Thameslink • 12 coaches
1
Later trains
Powered by National Rail Enquiries